Under the Swan Falls agreement, new upstream uses could outrank some Idaho Power rights
Ready to paste into a message or email.
Copy this address: https://idahowaterstatus.com/research/claims/CLM-000002
The short answer
Idaho Power’s rights to water above its set river flows give way to new upstream uses the state approves. Those uses can’t push the river below the set flows.
Paragraph 7(A) sets seasonal flows of 3,900 and 5,600 cubic feet per second, a flow rate. Paragraph 7(B) covers Idaho Power’s rights to water above those flows. Those rights are made subordinate, meaning they give way, to later upstream water uses. The state must first approve each use under state law. The exception is a use that would push flows at the Murphy gauge, just downstream of Swan Falls, under the 7(A) amounts.
Idaho Power kept the right to challenge any new water appropriation (a new right to take water) under state law. It could also require the state to take reasonable steps to keep those average daily flows at the gauge. Paragraphs 7(C) and 7(D) make the company’s rights, including the 7(A) flows, give way to certain other water users too. Because this section is part of paragraph 7, it would bind only after the agreement’s conditions were met. To learn whether a new project can get water today, ask the Idaho Department of Water Resources.
Research details and original wording
Record reference: CLM-000002
Original statement
Section 7(B) subordinates the listed Company rights above the section 7(A) amounts to later beneficial upstream uses approved under state law, unless their depletion would violate section 7(A). It preserves the Company's ability to contest appropriations and require reasonable state steps to protect the specified flows.
- Primary geography
- Unknown
- Time period covered
- Agreement dated 1984-10-25; later implementation and current legal status not established by this extraction
- Metric
- Conditional subordination and retained remedies.
- Unit
- Not applicable; qualitative legal provision.
- Caveat
- Historical terms do not establish observed flow, available supply, a present curtailment trigger, or the rights of an individual user. Read the conditions alongside the flow terms.
- Why it matters
- Not recorded
- Verification needed
- Visual check of cited pages; qualified legal review against subsequent instruments and operative accounting. P13 owns that research scope.
No geographies linked yet.
Not linked to a hypothesis yet.
Original wording is preserved below. Source attribution is not independent verification. Missing information is shown as Unknown.
- Documentary claim ID
- CLM-000002
- Original claim text
- Section 7(B) subordinates the listed Company rights above the section 7(A) amounts to later beneficial upstream uses approved under state law, unless their depletion would violate section 7(A). It preserves the Company's ability to contest appropriations and require reasonable state steps to protect the specified flows.
- Original source ID
- SRC-000077
- Source owner
- State of Idaho and Idaho Power Company; IDWR repository
- Authority tier
- Tier 1 - Primary data/legal record
- Claim type
- Historical legal-instrument text
- Original geography
- Snake River Basin; Swan Falls; Murphy gaging station described in the 1984 agreement
- Original time period
- Agreement dated 1984-10-25; later implementation and current legal status not established by this extraction
- Original metric
- Conditional subordination and retained remedies.
- Original unit
- Not applicable; qualitative legal provision.
- Water accounting type
- Legal availability
- Legal instrument type
- Settlement,Contract
- Preliminary confidence
- Medium; text inspected, page images and subsequent legal history unverified
- Original caveat
- Historical terms do not establish observed flow, available supply, a present curtailment trigger, or the rights of an individual user. Read the conditions alongside the flow terms.
- Original verification needed
- Visual check of cited pages; qualified legal review against subsequent instruments and operative accounting. P13 owns that research scope.
- Evidence for the claim
- Section 7(B), printed pages 3–4; [IDWR PDF page 4](https://idwr.idaho.gov/wp-content/uploads/sites/2/legal/swan-falls-settlement/19841025-Swan-Falls-Agreement.pdf#page=4); library PDF pages 6–7. Sections 7(C)–7(E) contain additional qualifications; this claim is limited to 7(B). Source record: SRC-000077; canonical URL: https://idwr.idaho.gov/wp-content/uploads/sites/2/legal/swan-falls-settlement/19841025-Swan-Falls-Agreement.pdf. Provenance: [Original CLM-000002](swan_falls_1984_agreement_extraction.md#clm-000002), original line 54. Consolidated September 29, 2026; original fields and scientific confidence retained, no new scientific verification.
- Evidence against and limitations
- No contradictory text identified in the inspected sections; later amendments, decrees and orders have not been evaluated here.
- Related basin
- Snake River Basin; Upper Snake / ESPA research profile
- Related cross-cutting systems
- swan_falls,trust_water,hydropower,legal_instruments,governance
- Original documentary status
- Preliminary; historical text inspected; current applicability unverified
preliminary_claims.jsonl#CLM-000002