The short answer
Three key parts had to wait for new state laws, a change to the State Water Plan and orders from regulators.
The 1984 agreement took effect when signed, except for paragraphs 7, 8 and 11. Paragraph 7 sets Idaho Power’s water right and its seasonal flows. In paragraph 8, the company gives up claims for damages against the state over any drop in water at its plants caused by the agreement. Paragraph 11 has both sides offer the State Water Plan and the agreement to federal energy regulators as a plan for the Snake River watershed.
Paragraph 13 lists seven conditions for those three sections. They include amending the State Water Plan, passing state laws on subordination and other topics, and getting an order from the Federal Energy Regulatory Commission. Another is ending a pending case before the Idaho Public Utilities Commission. If any condition failed, the agreement would be void. The parties set a May 15, 1985 meeting to decide whether to continue it. The signed document cannot show which conditions were later met. To trace what happened next, look to later laws, regulatory orders and court records.
Research details and original wording
Record reference: CLM-000003
Original statement
Sections 1, 10 and 13 distinguish execution from effectiveness of paragraphs 7, 8 and 11. Section 13 makes those provisions conditional on specified legislative, planning, regulatory and litigation actions. The signed instrument alone does not establish that those conditions were satisfied.
- Primary geography
- Unknown
- Time period covered
- Agreement dated 1984-10-25; later implementation and current legal status not established by this extraction
- Metric
- Conditions precedent to the specified provisions taking effect.
- Unit
- Not applicable; qualitative legal provision.
- Caveat
- Historical terms do not establish observed flow, available supply, a present curtailment trigger, or the rights of an individual user. Read the conditions alongside the flow terms.
- Why it matters
- Not recorded
- Verification needed
- Visual check of cited pages; qualified legal review against subsequent instruments and operative accounting. P13 owns that research scope.
No geographies linked yet.
Not linked to a hypothesis yet.
Original wording is preserved below. Source attribution is not independent verification. Missing information is shown as Unknown.
- Documentary claim ID
- CLM-000003
- Original claim text
- Sections 1, 10 and 13 distinguish execution from effectiveness of paragraphs 7, 8 and 11. Section 13 makes those provisions conditional on specified legislative, planning, regulatory and litigation actions. The signed instrument alone does not establish that those conditions were satisfied.
- Original source ID
- SRC-000077
- Source owner
- State of Idaho and Idaho Power Company; IDWR repository
- Authority tier
- Tier 1 - Primary data/legal record
- Claim type
- Historical legal-instrument text
- Original geography
- Snake River Basin; Swan Falls; Murphy gaging station described in the 1984 agreement
- Original time period
- Agreement dated 1984-10-25; later implementation and current legal status not established by this extraction
- Original metric
- Conditions precedent to the specified provisions taking effect.
- Original unit
- Not applicable; qualitative legal provision.
- Water accounting type
- Legal availability
- Legal instrument type
- Settlement,Contract
- Preliminary confidence
- Medium; text inspected, page images and subsequent legal history unverified
- Original caveat
- Historical terms do not establish observed flow, available supply, a present curtailment trigger, or the rights of an individual user. Read the conditions alongside the flow terms.
- Original verification needed
- Visual check of cited pages; qualified legal review against subsequent instruments and operative accounting. P13 owns that research scope.
- Evidence for the claim
- Sections 1, 10 and 13, printed pages 1, 5 and 7–8; [IDWR PDF page 7](https://idwr.idaho.gov/wp-content/uploads/sites/2/legal/swan-falls-settlement/19841025-Swan-Falls-Agreement.pdf#page=7) and page 8; library PDF pages 4, 8 and 10–11. Section 16 on printed page 8 also addresses continuation/termination. Source record: SRC-000077; canonical URL: https://idwr.idaho.gov/wp-content/uploads/sites/2/legal/swan-falls-settlement/19841025-Swan-Falls-Agreement.pdf. Provenance: [Original CLM-000003](swan_falls_1984_agreement_extraction.md#clm-000003), original line 61. Consolidated September 29, 2026; original fields and scientific confidence retained, no new scientific verification.
- Evidence against and limitations
- No contradictory text identified in the inspected sections; later amendments, decrees and orders have not been evaluated here.
- Related basin
- Snake River Basin; Upper Snake / ESPA research profile
- Related cross-cutting systems
- swan_falls,trust_water,hydropower,legal_instruments,governance
- Original documentary status
- Preliminary; historical text inspected; current applicability unverified
preliminary_claims.jsonl#CLM-000003