Skip to content
Source summary

Idaho Water Resource Board Resolution 30-2026 on the March 2026 Swan Falls shortfall

Ready to paste into a message or email.

Copy this address: https://idahowaterstatus.com/research/sources/SRC-000164

What this source tells us

Snake River flows at Murphy fell below the winter minimum in March 2026. The state water board offered stored water to make up the gap.

The Idaho Water Resource Board (IWRB) adopted this resolution on May 21, 2026. It says the flow at the Murphy gauge, just below Swan Falls Dam, fell short in March 2026. For several days the adjusted average daily flow was under the 5,600 cubic feet per second winter minimum. The board agreed to use its “Debit System,” set up by Resolution 3-15 in March 2015. Idaho Power may call for water from the board’s 5,000 acre-feet of space in Palisades Reservoir. An acre-foot covers an acre one foot deep, about 326,000 gallons. Deliveries match the shortfall acre-foot for acre-foot, on Idaho Power’s schedule, until it is replaced or the storage runs out. The board pays delivery costs and fees.

The resolution does not say how much water Idaho Power called for or received. The file holds 14 board resolutions from May 21, 2026, Nos. 19-2026 to 32-2026. This one is on PDF pages 49 and 50. Two others touch Swan Falls. Resolution 32-2026 lets the board chairman sign a flow exchange with the U.S. Bureau of Reclamation. It says storage may be needed to offset Murphy shortfalls. Resolution 28-2026 notes that Murphy flows fell below the minimums in 2015.

Selected passages read · Summary checked November 6, 2026

How this summary was checked

Read the original source (opens a new tab)

Source details and citation information

Record reference: SRC-000164

Catalog title: IWRB Resolution 30-2026 to offset the March 2026 Swan Falls minimum-streamflow shortfall

Tier 1 - Primary data/legal record
Needs review
Legal order
Overview
Owner
Idaho Water Resource Board (State agency)
Source authority
Tier 1 - Primary data/legal record
Source type
Legal order
Period covered
2026-05-21
Publication date
May 21, 2026
Geography
Snake River; Milner Dam to Murphy Gage / Swan Falls and tributary areas
Update cadence
Static / legal / historical
Water accounting type
Legal availability
Provisional status
Legal record
Caveats & use
Primary use
Primary evidence
Known caveats
Board authorization and reported shortfall are not proof of delivery, a computed deficit volume, or permanent mitigation. Other resolutions in the bundle were not reviewed.
Human review
Required
Claims citing this source

No claims cite this source yet.

Linked bibliographic holdings

No linked holdings.