Idaho Water Resource Board Resolution 30-2026 on the March 2026 Swan Falls shortfall
Ready to paste into a message or email.
Copy this address: https://idahowaterstatus.com/research/sources/SRC-000164
What this source tells us
Snake River flows at Murphy fell below the winter minimum in March 2026. The state water board offered stored water to make up the gap.
The Idaho Water Resource Board (IWRB) adopted this resolution on May 21, 2026. It says the flow at the Murphy gauge, just below Swan Falls Dam, fell short in March 2026. For several days the adjusted average daily flow was under the 5,600 cubic feet per second winter minimum. The board agreed to use its “Debit System,” set up by Resolution 3-15 in March 2015. Idaho Power may call for water from the board’s 5,000 acre-feet of space in Palisades Reservoir. An acre-foot covers an acre one foot deep, about 326,000 gallons. Deliveries match the shortfall acre-foot for acre-foot, on Idaho Power’s schedule, until it is replaced or the storage runs out. The board pays delivery costs and fees.
The resolution does not say how much water Idaho Power called for or received. The file holds 14 board resolutions from May 21, 2026, Nos. 19-2026 to 32-2026. This one is on PDF pages 49 and 50. Two others touch Swan Falls. Resolution 32-2026 lets the board chairman sign a flow exchange with the U.S. Bureau of Reclamation. It says storage may be needed to offset Murphy shortfalls. Resolution 28-2026 notes that Murphy flows fell below the minimums in 2015.
Selected passages read · Summary checked November 6, 2026
How this summary was checked
-
Combined May 21, 2026 resolution packet, PDF pp. 49–50 / Resolution 30-2026 pp. 1–2; other packet resolutions excluded.
Open the referenced material (opens in a new tab)
Read the original source (opens a new tab)
Source details and citation information
Record reference: SRC-000164
Catalog title: IWRB Resolution 30-2026 to offset the March 2026 Swan Falls minimum-streamflow shortfall
- Owner
- Idaho Water Resource Board (State agency)
- Source authority
- Tier 1 - Primary data/legal record
- Source type
- Legal order
- Period covered
- 2026-05-21
- Publication date
- May 21, 2026
- Geography
- Snake River; Milner Dam to Murphy Gage / Swan Falls and tributary areas
- Update cadence
- Static / legal / historical
- Water accounting type
- Legal availability
- Provisional status
- Legal record
- Primary use
- Primary evidence
- Known caveats
- Board authorization and reported shortfall are not proof of delivery, a computed deficit volume, or permanent mitigation. Other resolutions in the bundle were not reviewed.
- Human review
- Required
No claims cite this source yet.
No linked holdings.