Meridian water master plan summary, February 2025
Ready to paste into a message or email.
Copy this address: https://idahowaterstatus.com/research/sources/SRC-000191
What this source tells us
Many yards in Meridian get canal water, not tap water. That keeps the city’s use per person low for Idaho.
Keller Associates wrote this plan for the City of Meridian, using data through the end of 2022. The 18-page download holds the cover and executive summary. In 2023 the city system served about 130,000 people from 25 wells, two storage tanks and almost 700 miles of pipe. Irrigation districts deliver surface water to separate systems for many landscapes. Some areas still water with city drinking water. Either they were built before separate systems were required, or they have no access to surface water for irrigation.
Homes and apartments make up over 90% of connections but use about 75% of the water each year. The largest users are medical facilities, water parks, car washes and irrigation sprinkler systems. The plan expects the city system to serve about 197,000 people by 2043, and it projects demand from population and job growth. To learn which planned projects have been built, ask the City of Meridian.
Selected passages read · Summary checked November 6, 2026
How this summary was checked
-
PDF pages 2 and 6–8: planning basis, population projections, historical demand and water audit.
Open the referenced material (opens in a new tab)
Read the original source (opens a new tab)
Source details and citation information
Record reference: SRC-000191
Catalog title: Water Master Plan — City of Meridian (February 2025; executive-summary download)
- Owner
- City of Meridian; Keller Associates
- Source authority
- Tier 3 - Scientific/technical synthesis
- Source type
- Plan
- Period covered
- Analysis through 2022; 2023 baseline; future scenarios through build-out
- Publication date
- Unknown
- Geography
- Meridian potable-water service area
- Update cadence
- Irregular
- Water accounting type
- Withdrawal,Forecast
- Provisional status
- Mixed
- Primary use
- Mechanism/explanation
- Known caveats
- The retrieved file has 18 pages: cover and Chapter 1 only, despite the broader PDF title. Remaining chapters, appendices, hydraulic model and project completion are unverified. Some native text is garbled; do not extract loss percentages or graph values without image review. Potable demand is not depletion.
- Human review
- Required
No claims cite this source yet.
No linked holdings.