What this source tells us
Limits and testing rules for treated water from Boise’s West Boise plant, plus a phosphorus removal site on Dixie Slough.
The Idaho Department of Environmental Quality (DEQ) issued this state discharge permit to the City of Boise for its West Boise Water Renewal Facility. It took effect July 1, 2022. A minor change followed in August 2022, and a major change took effect February 16, 2024. The permit expires June 30, 2027, and Boise’s renewal application is due December 30, 2026. It covers three outfalls, the points where water is released. Treated wastewater from the Lander Street and West Boise plants goes to the Boise River. A phosphorus removal facility releases to Dixie Slough, and the phosphorus it removes counts toward the plants’ combined limit. The permit also sets schedules for meeting phosphorus and temperature limits.
The permit names three kinds of sampling sites. Some test water as it enters treatment. Others test the water released at each outfall, called effluent. The rest are stations in the river and slough. A river reading is not a plant’s discharge, and a permit limit is not a measurement. To see how the plant performed, look at its dated discharge monitoring reports.
Selected passages read · Summary checked November 6, 2026
How this summary was checked
-
PDF pages 1 and 5–6: modification dates, discharge authorization and outfall/receiving-water monitoring locations.
Open the referenced material (opens in a new tab)
Read the original source (opens a new tab)
Source details and citation information
Record reference: SRC-000214
Catalog title: West Boise Water Renewal Facility — IPDES ID0023981, modified permit
- Owner
- DEQ (State agency)
- Source authority
- Tier 1 - Primary data/legal record
- Source type
- Permit
- Period covered
- Effective July 1, 2022; major modification effective February 16, 2024; expires June 30, 2027
- Publication date
- June 1, 2022
- Geography
- Boise and Dixie Slough; Ada/Canyon counties
- Update cadence
- Irregular
- Water accounting type
- Discharge,Return flow,Water-quality concentration
- Provisional status
- Legal record
- Primary use
- Legal authority
- Known caveats
- Filename underplays the January 18, 2024 major modification. Combined phosphorus credit is not a physical effluent volume or hydrologic saving; interim/final limits and schedules must be applied to the correct period.