What this source tells us

Boise pulls phosphorus out of a farm drain 40 miles downstream to offset costlier upgrades at its sewer plants.

Dixie Drain is an irrigation channel, built in the early 1900s, that returns farm water to the lower Boise River. It sits about 40 miles downstream of Boise’s two wastewater plants. The U.S. Environmental Protection Agency’s case study calls it the largest tributary source of phosphorus to the river during irrigation season. When Boise’s discharge permits added strict phosphorus limits, they also included building and running a removal plant on the drain. The facility opened in July 2016. Chemicals called flocculants bind the phosphorus into clumps that settle in a basin. The clumps are dredged out, and the treated water returns to the river.

Boise’s permits require removing at least 25 pounds of phosphorus a day from May through September. At full capacity in that season, the facility can treat up to 130 million gallons a day. It can remove more than 140 pounds of phosphorus a day. Those are capacity figures, not measured yearly results. The case study links to the City of Boise’s Dixie Drain project page for more detail.

Original document read · Summary checked November 6, 2026

How this summary was checked

Read the original source (opens a new tab)

Source details and citation information

Record reference: SRC-000236

Catalog title: Nutrient Reduction Case Study: Dixie Drain Phosphorus Removal Facility

Tier 2 - Official interpretation/operations
Needs review
PDF report
Overview
Owner
EPA (Federal agency)
Source authority
Tier 2 - Official interpretation/operations
Source type
PDF report
Period covered
Undated case study; reports operation beginning July 2016
Publication date
Unknown
Geography
Dixie Drain / Lower Boise River
Update cadence
Irregular
Water accounting type
Discharge,Permit/compliance
Provisional status
Mixed
Caveats & use
Primary use
Implemented project, agency account
Known caveats
Full-capacity treatment/removal figures are capacity statements. EPA benefit language is not a controlled outcome study or current DMR total. Use newer permit and monitoring records for dated terms/results.
Human review