Relining six miles of the New York Canal above Boise
Ready to paste into a message or email.
Copy this address: https://idahowaterstatus.com/research/sources/SRC-000287
What this source tells us
The New York Canal carries a small river’s flow above thousands of Boise homes. An $81.5 million relining is set to finish in 2030.
The New York Canal runs 41 miles from Diversion Dam on the Boise River west to Lake Lowell. It carries water for five irrigation districts that serve about 165,000 acres in the Treasure Valley. The U.S. Bureau of Reclamation finished the canal in 1909 and owns it, and the Boise Project Board of Control runs it. Reclamation lists it as an “Urban Canal of Concern” because of its age and public safety. Its first six miles carry about 2,500 cubic feet per second, a flow the size of a small river, on a bench above dense housing. The canal has had one major breach, in the mid-1950s. Bob Carter, the Board of Control’s project manager, said the goal is to act early “to prevent any kind of major event from happening.”
The plan calls for a geomembrane liner capped with concrete, laid one mile each fall and winter outside irrigation season. The state’s project profile set the work to start in October 2024 and finish in spring 2030. The Idaho Water Resource Board approved $50 million of the $81.5 million cost, all from federal American Rescue Plan Act funds. The profile projects total savings of about 29,370 acre-feet once the work is done (an acre-foot covers one acre a foot deep). That water would stay in storage to help reservoirs fill the next year. “We aren’t ‘making’ any new water,” Carter said, “we are just conserving what we already have.”
Selected passages read · Summary checked November 6, 2026
How this summary was checked
-
Original PDF pages 1–3, project scope, funding, schedule, and projected savings
Open the referenced material (opens in a new tab)
Read the original source (opens a new tab)
Source details and citation information
Record reference: SRC-000287
Catalog title: Modernizing Idaho’s Water Infrastructure — New York Canal project profile, Issue 3
- Owner
- Idaho Department of Water Resources / Idaho Water Resource Board (State agency)
- Source authority
- Tier 2 - Official interpretation/operations
- Source type
- PDF report
- Period covered
- URL under July 2026; publication date UNKNOWN; describes October 2024 start and spring 2030 forecast finish
- Publication date
- Unknown
- Geography
- New York Canal, Boise area, Idaho
- Update cadence
- Static / legal / historical
- Water accounting type
- Unknown
- Provisional status
- Mixed
- Primary use
- Official interpretation
- Known caveats
- Profile is not an engineering inspection or executed funding ledger. Later regional list shows $52.4 million IWRB obligations. Do not add overlapping state/federal allocations or equate reduced seepage with net depletion savings.
- Human review
- Required
No claims cite this source yet.
No linked holdings.