Water use in the draft review of Micron’s first new Boise chip plant

Ready to paste into a message or email.

Copy this address: https://idahowaterstatus.com/research/sources/SRC-000360

What this source tells us

A 2024 federal draft says the plant would add about 5.5 million gallons a day of water demand, counting all sources.

The National Institute of Standards and Technology released this draft environmental assessment on July 10, 2024, while weighing federal funding for the project. It covers the first new chip plant (ID1) at Micron’s Boise campus. ID1 would add about 5.5 million gallons a day (MGD) of demand from all sources. One table calls this an average and another a projected maximum. Up to 3.0 MGD of it would come from the Veolia municipal water system. Added to the campus’s current use of about 4.0 MGD, total demand would be 9.5 MGD. These are planning estimates, not measured use.

Micron’s current water rights allow it to pump up to 4,506.7 acre-feet of groundwater a year. An acre-foot is enough water to cover an acre one foot deep, about 326,000 gallons. The draft says only 1,750 acre-feet a year of Micron pumping is sustainable from the Boise-Fan aquifer without recharge. To offset its pumping, Micron injects surface and irrigation water underground through wells. The 4,506.7 figure is a legal limit, not a measure of actual pumping.

Wastewater from ID1 would go to a planned Micron treatment plant called Opal, designed to produce no liquid waste. The summary table lists 2.9 MGD under “discharge.” Elsewhere the draft gives the same figure as Opal’s planned average output of treated water, which is meant for reuse on the campus. It expects no increase in wastewater sent to Micron’s existing outfalls. Under a City of Boise contingency plan, Opal water could go to the city’s treatment plant during start-up or other upset conditions. The draft rates ID1’s effect on water supply as moderate.

Selected passages read · Summary checked November 6, 2026

How this summary was checked

Read the original source (opens a new tab)

Source details and citation information

Record reference: SRC-000360

Catalog title: Draft Environmental Assessment for Micron ID1, Boise, Idaho

Tier 2 - Official interpretation/operations
Needs review
PDF report
Overview
Owner
National Institute of Standards and Technology, CHIPS Program Office (Federal agency)
Source authority
Tier 2 - Official interpretation/operations
Source type
PDF report
Period covered
July 2024 existing-campus baseline and proposed ID1 scenario; excludes ID2
Publication date
July 10, 2024
Geography
Micron Boise campus, Idaho
Update cadence
Irregular
Water accounting type
Forecast
Provisional status
Mixed
Caveats & use
Primary use
Primary attributed evidence for proposed semiconductor-manufacturing layer scope
Known caveats
Draft, ID1-only, not final approval or present operation. Table 2-1 labels 5.5 MGD average whereas Table 3-30 footnote calls it projected maximum. Annual printed delta differs by 1 MG from subtraction. Municipal 3.0 MGD is included, not additive. Planned 2.9 MGD Opal treatment/discharge is associated with internal reuse, not established environmental return flow. No current consumption or ID2 extrapolation.