Water District 1 counted about 615,000 acre-feet in Upper Snake reservoirs on October 31, 2026. A wet October built almost no snow, and a full refill in 2027 is at risk.
Water District 1’s November 4, 2026 report puts physical reservoir system carryover, the water still stored on October 31, at 614,815 acre-feet. An acre-foot covers an acre one foot deep, about 326,000 gallons. That total is about 539,000 acre-feet less than in 2025. Since October 1, precipitation has run 131 percent of median above Heise and 110 percent in the Henrys Fork and Teton basins. It reached 262 percent in the Willow, Blackfoot and Portneuf basins. Most fell as rain or melted, so snowpack was near zero.
The district says years with similar carryover point to a meaningful risk that the American Falls 1921 water right may not completely fill in 2027. If it does not, junior (newer) reservoir rights, including Island Park 1935, Palisades 1939 and Ririe 1969, would get no new stored water. A full refill will likely take well above average precipitation and snowpack, possibly an April 1 runoff forecast at Heise above 120 percent of normal. That is a risk drawn from past years, not a forecast of 2027 deliveries. As of the report, the Idaho Water Resource Board was recharging the aquifer below Minidoka at about 500 cubic feet per second, a flow rate. It used the North Side Canal, Twin Falls Canal and Southwest Irrigation District systems.
Selected passages read · Summary checked November 6, 2026
How this summary was checked
-
November 4, 2026 district water report, PDF page 1
Open the referenced material (opens in a new tab)
Read the original source (opens a new tab)
Source details and citation information
Record reference: SRC-000370
Catalog title: Water District 01 operating reports, accounting manual and rental procedures
- Owner
- Water District 01
- Source authority
- Tier 2 - Official interpretation/operations
- Source type
- Webpage
- Period covered
- September 23, 2026 weekly report; preliminary storage header July 8, 2026; April 14, 2023 manual; rental cover 2026 with interior 2025 heading
- Publication date
- Unknown
- Geography
- Eastern Snake Plain and Upper Snake system, Idaho
- Update cadence
- Irregular
- Water accounting type
- Storage,Diversion,Legal availability
- Provisional status
- Mixed
- Primary use
- Primary evidence
- Known caveats
- Selected PDF pages only. Manual filename says April 12 while cover says April 14, 2023. Rental cover says 2026 but interior heading says 2025. No complete account reconciliation, current rental availability, operative approval-history audit or individual groundwater compliance conclusion.