What this source tells us
A study of Clearwater River water for the Palouse began in spring 2025 and was set to take about a year.
The City of Moscow and the Palouse Basin Aquifer Committee (PBAC) started this study in spring 2025. HDR Engineering leads the work, which the page calls about 12 months long. The Idaho Water Resource Board and PBAC pay for it. Thanks to conservation and better technology, the aquifer’s decline has slowed over 30 years, from 1.3 to 0.7 feet a year. Pumping still outpaces natural recharge. PBAC calls the Clearwater the most workable option studied so far.
The study weighs two uses. River water could be treated and sent straight into city systems, but high flows come in winter and spring, when demand is low. Or treated water could be pumped into the aquifer for later use, called aquifer storage and recovery. That raises concerns about adding treated river water to groundwater filtered naturally over hundreds or thousands of years. The work covers supply, design, water quality, permits and costs. It also includes outreach to the Nez Perce Tribal Executive Committee and landowners. When we checked on November 6, 2026, the page posted no answers on timeline or on how much water would be diverted.
Agency or publisher page read · Summary checked November 6, 2026
How this summary was checked
-
PBAC Clearwater River Diversion Study page, project overview, project elements, use options and FAQs
Open the referenced material (opens in a new tab)
Read the original source (opens a new tab)
Source details and citation information
Record reference: SRC-000478
Catalog title: Palouse Clearwater River supplemental-supply study and 2026 committee progress
- Owner
- Palouse Basin Aquifer Committee
- Source authority
- Tier 2 - Official interpretation/operations
- Source type
- Webpage
- Period covered
- Study initiated spring 2025; approved minutes August 20, 2026; agenda September 17, 2026
- Publication date
- Unknown
- Geography
- Moscow–Pullman / Palouse, Idaho and Washington; component-specific boundaries
- Update cadence
- Irregular
- Water accounting type
- Unknown
- Provisional status
- Mixed
- Primary use
- Palouse source coverage and qualified interpretation
- Known caveats
- Proposed import from Clearwater is separate from Palouse watershed supply. Twelve-month expectation is not completion evidence. No final design, approved diversion, construction, full financing or measured aquifer benefit verified. Direct use and ASR differ. Offered Tribal engagement is not consent; possible upper-aquifer pumping discussion is not approval.