Skip to content
Source summary

Studying Clearwater River water for the Palouse

Ready to paste into a message or email.

Copy this address: https://idahowaterstatus.com/research/sources/SRC-000478

What this source tells us

A study of Clearwater River water for the Palouse began in spring 2025 and was set to take about a year.

The City of Moscow and the Palouse Basin Aquifer Committee (PBAC) started this study in spring 2025. HDR Engineering leads the work, which the page calls about 12 months long. The Idaho Water Resource Board and PBAC pay for it. Thanks to conservation and better technology, the aquifer’s decline has slowed over 30 years, from 1.3 to 0.7 feet a year. Pumping still outpaces natural recharge. PBAC calls the Clearwater the most workable option studied so far.

The study weighs two uses. River water could be treated and sent straight into city systems, but high flows come in winter and spring, when demand is low. Or treated water could be pumped into the aquifer for later use, called aquifer storage and recovery. That raises concerns about adding treated river water to groundwater filtered naturally over hundreds or thousands of years. The work covers supply, design, water quality, permits and costs. It also includes outreach to the Nez Perce Tribal Executive Committee and landowners. When we checked on November 6, 2026, the page posted no answers on timeline or on how much water would be diverted.

Agency or publisher page read · Summary checked November 6, 2026

How this summary was checked

Read the original source (opens a new tab)

Source details and citation information

Record reference: SRC-000478

Catalog title: Palouse Clearwater River supplemental-supply study and 2026 committee progress

Tier 2 - Official interpretation/operations
Needs review
Webpage
Overview
Owner
Palouse Basin Aquifer Committee
Source authority
Tier 2 - Official interpretation/operations
Source type
Webpage
Period covered
Study initiated spring 2025; approved minutes August 20, 2026; agenda September 17, 2026
Publication date
Unknown
Geography
Moscow–Pullman / Palouse, Idaho and Washington; component-specific boundaries
Update cadence
Irregular
Water accounting type
Unknown
Provisional status
Mixed
Caveats & use
Primary use
Palouse source coverage and qualified interpretation
Known caveats
Proposed import from Clearwater is separate from Palouse watershed supply. Twelve-month expectation is not completion evidence. No final design, approved diversion, construction, full financing or measured aquifer benefit verified. Direct use and ASR differ. Offered Tribal engagement is not consent; possible upper-aquifer pumping discussion is not approval.
Human review
Required
Claims citing this source

No claims cite this source yet.

Linked bibliographic holdings

No linked holdings.