Skip to content
Source summary

Moscow’s 2025 water report

Ready to paste into a message or email.

Copy this address: https://idahowaterstatus.com/research/sources/SRC-000482

What this source tells us

Moscow’s water tests came in under federal limits, but the Palouse groundwater it relies on keeps dropping.

Moscow gets its water from six wells in the shallower Wanapum aquifer and the deeper Grande Ronde. The report covers tests from January 1 through December 31, 2025, and lists each substance the city detected. All were under their federal limits. Some results come from earlier years, back to 2018. The report says the state lets the city test some substances less than once a year. Lead tests at 30 sites around town in 2024 found none over the federal action level. At high levels, lead can cause serious health problems, especially for pregnant women and young children. It comes mainly from service lines and home plumbing. If water has sat for hours, the city says to run the tap for 30 seconds to 2 minutes before drinking or cooking.

The report also carries a note from the Palouse Basin Aquifer Committee, a group of local cities, counties, universities and state water agencies. It says demand is greater than the aquifer can naturally supply and that groundwater levels are steadily dropping. The committee thinks the best extra source may be a diversion from the Clearwater River. That would need new facilities to collect and treat the water.

Selected passages read · Summary checked November 6, 2026

How this summary was checked

Read the original source (opens a new tab)

Source details and citation information

Record reference: SRC-000482

Catalog title: City of Moscow 2025 annual water-quality report

Tier 2 - Official interpretation/operations
Needs review
PDF report
Overview
Owner
City of Moscow, Idaho
Source authority
Tier 2 - Official interpretation/operations
Source type
PDF report
Period covered
2025 report with mixed sample years and 2026 conservation discussion; publication day unknown
Publication date
Unknown
Geography
Moscow public water system 2290023, Idaho
Update cadence
Annual
Water accounting type
Water-quality concentration
Provisional status
Mixed
Caveats & use
Primary use
Palouse source coverage and qualified interpretation
Known caveats
Mixed sample years and provider reporting require separate regulator review. Does not cover private wells or other cities. Direct HTTP failures do not mean report absence. Conservation work is not measured savings.
Human review
Required
Claims citing this source

No claims cite this source yet.

Linked bibliographic holdings

No linked holdings.