After a 2023 rebuild, Veolia’s Columbia plant can count on treating 10 million gallons of water a day. Slides show a plan to double that.
Roger Greaves and Steven Beard presented these slides on Veolia Water Idaho’s project. The Pacific Northwest Section of the American Water Works Association posted them in 2025. The slides say Veolia serves about 265,000 people in Boise, Eagle, Meridian and Ada County. It draws on more than 80 wells and two surface water treatment plants. Its system had its first 100-million-gallon day in summer 2024. Columbia, one of the two plants, filters water through membranes. Its rebuild ran from October 2022 to May 2023.
From 2005 to 2020, the plant had six racks, each rated at 1 million gallons a day. In the 2023 setup, each of its seven membrane racks is rated at 2 million gallons a day. That adds up to 14 million, but the plant keeps two racks in reserve, so its firm capacity is 10 million gallons a day. Firm capacity is what the plant can count on with backup units set aside. To reach 20 million gallons a day, the plan adds three racks and eight more membrane modules to each rack. The slides present that as a plan, not finished work. Whether Veolia can serve a new development also depends on its other plants, wells, pipes and existing commitments.
Selected passages read · Summary checked November 6, 2026
How this summary was checked
-
May 2025 conference presentation, PDF slide 11 visually inspected: 2023 configuration, rack count, N+2 reserve and expansion comparison.
Open the referenced material (opens in a new tab)
Read the original source (opens a new tab)
Source details and citation information
Record reference: SRC-000562
Catalog title: Veolia’s Award Winning Columbia WTP Expansion
- Owner
- Veolia presentation by Roger Greaves, P.E., and Steven Beard; hosted by Pacific Northwest Section AWWA (Utility/operator)
- Source authority
- Tier 3 - Scientific/technical synthesis
- Source type
- PDF report
- Period covered
- 2023 installed configuration; summer 2024 operating context; hosted in 2025/05
- Publication date
- Unknown
- Geography
- Veolia Water Idaho; Boise and portions of Ada County; document-specific boundaries
- Update cadence
- Static / legal / historical
- Water accounting type
- Withdrawal
- Provisional status
- Mixed
- Primary use
- Mechanism / explanation
- Known caveats
- Plant-specific engineering presentation, not whole-system uncommitted capacity. Marden 16 MGD differs from annual filing rating of 12700 gpm; basis unresolved. Different-year daily figures do not establish a matched demand trend. No 2026 upgrade completion established.